This week, we’re at the eastern industrial area of Singapore at Boon Lay. We were tasked to install 14 VRF aircon units with a total of 70 Horsepower with each unit spanning at a 5-6m vertical service height across the building. As shown in our previous posts, heights do not pose any challenge to us. However, the real challenge in this project is regarding having to control specific variables of the surrounding temperature as required by our client. To cater to their requirements, what we did is to install additional dehumidifiers to assist with the climate control. We’ll always do our utmost best, even going the extra miles, to customize and fit our solutions to our valuable client requirements.